Existing Pages checkpoint refresh — 2026-09-08
The existing emberian/dragons-clutch Pages workflow deployed the committed development checkpoint through the existing app, documentation renderer and domain. No parallel frontend or hosting project was introduced.
| Fact | Checked value |
|---|---|
| Live source commit | 1cedeeed174793db5a034cc5915512072a254815 |
Live tree / published dclutch/ tree | 57f94a355355dd74772bcd74318c57539da00c4d |
| Publication cut | 52883b54ced44c158aeb9f3ab1cabfa97b2a92d2 |
| Workflow run | 34188654553, success |
| GitHub deployment | 6320895602, success at 2026-09-08T04:55:29Z |
| Existing environment | https://clutch.dregg.pro/ |
tools/cut.sh found zero credential findings, verified tree equality and pushed the content cut to public main. The workflow built the static frontend and assembled 431 files: 178 documentation pages, 248 pages link-checked, six guides from the existing index and 25 trailing-slash directory indexes. The app remains mounted at the domain root, with documentation under /docs.
This refresh publishes the strict-build checkpoints, accepted General loopback founding addendum and current development plan. The app, guide sources and renderer are byte-identical to the preceding explorer follow-up publication. The checked evidence is repository metadata, workflow logs and deployment status; it does not add visual-browser validation or prove a running simulator. Configured devnet identities still name cohort 17. A fresh all-eight devnet cohort and its supervised simulator remain outstanding.